Lucknow, June 8 : People in Uttar Pradesh got some respite from the heat and humidity after skies opened up over the state capital and neighbouring areas on Friday.
As heavy rains lashed the city for more than two hours, youngsters took to streets and drenched themselves in the first rains of the season.
The Regional Met office said these were pre-monsoonal showers and the weather would remain the same for the next 24-hours. The skies would be overcast with intermittent rains in Lucknow and eastern Uttar Pradesh.
It predicted gusty winds along with rains in Lucknow, Barabanki, Unnao, Sitapur and Hardoi in the next 24-hours till Saturday.
There were heavy traffic snarls at many places like Hazratganj, Alambagh, Narahi, Indira Nagar, Aliganj and Gomtinagar with office goers and commuters facing a tough time.
Power outages were also reported from many localities here.
As roads were dug up for sewer pipeline laying to improve the drainage system ahead of the monsoon, many low lying areas turned into pools and people had to wade through them.
Angry residents questioned the rationale behind the government's pre- monsoon jobs. Internet connectivity was also been hit at some places due to water logging or snapping of the optical fibre cable.
Let the Truth be known. If you read VB and like VB, please be a VB Supporter and Help us deliver the Truth to one and all.
Bengaluru (PTI): Power bills for consumers under the Bangalore Electricity Supply Company Limited (BESCOM) will go up from May 1, following an order issued by the Karnataka Electricity Regulatory Commission (KERC) on Friday.
The hike comes after KERC allowed the BESCOM to recover a revenue deficit of Rs 2,068 crore incurred in 2024-25, from the consumers.
As a result, for every unit of electricity consumed in 2024-25, the customers will be charged an additional 56 paise, it said.
"BESCOM shall calculate, for each of the active consumers of FY2024-25 the amount to be recovered based on their actual energy consumption during FY2024-25. Such amount shall be recovered during FY 2026-27 in equal monthly instalments, to be called as 'FY25 True up Charges', commencing from the first meter reading date falling on or after 1 May 2026 and concluding with the reading date ending on 30 April 2027," the order said.
"It is further ordered that BESCOM shall maintain a separate head of account, allocated for the purpose, to record the adjustment of the said amount to ensure full recovery of the deficit," it added.
Similarly Chamundeshwari Electricity Supply Corporation Limited (CESC) has also recorded a revenue deficit of Rs 121.71 crore and can collect an additional 15 paisa per unit for consumption in 2024-25, official sources said.
