Amaravati (Andhra Pradesh) (PTI): Andhra Pradesh NDA partners finalised their seat-sharing formula for the Lok Sabha and state polls following a marathon discussion on Monday, under which the BJP will contest six Lok Sabha and 10 assembly seats while the TDP will fight 17 parliamentary and 144 state seats.

Under the deal, Pawan Kalyan's JanaSena will contest two Lok Sabha and 21 assembly seats, TDP supremo N Chandrababu Naidu announced after the meeting.

Senior BJP leader and Union Jal Shakti Minister Gajendra Singh Shekhawat went into a huddle with TDP supremo Naidu and JanaSena chief Kalyan in Amaravati to finalise seat-sharing for the upcoming Parliamentary and Assembly elections.

"In Amaravati today, the BJP, TDP and JSP (Janasena) forged a formidable seat-sharing formula. With this significant step, the people of Andhra Pradesh now stand on the threshold of reclaiming our state and paving the way for a brighter future. I humbly call upon my people of Andhra Pradesh to shower their blessings upon this alliance, and grant us a historic mandate to serve them," said Naidu in a post on X.

The state has 25 Lok Sabha and 175 assembly seats.

JanaSena was initially supposed to contest 24 assembly and three Lok Sabha seats, but in the seat-sharing formula it got 21 assembly and two Lok Sabha seats, after the TDP joined the NDA alliance recently.

The 2024 polls will be the first time the three parties are contesting the polls together. Back in 2014, when TDP and BJP fought the polls together, JanaSena was their outside ally.

The TDP and JanaSena have announced the names of 100 candidates already, and Naidu said the respective parties will name other candidates soon.

According to the TDP supremo, the Monday brainstorming exercise sought to forge a formidable combination of seats for every alliance partner that truly represents the people of Andhra Pradesh and their aspirations.

Meanwhile, TDP sources said that the state's opposition party have invited Prime Minister Narendra Modi to attend an election meeting which could take place between March 17 and 20.

"We have invited Modi for the meeting, mostly he will come for the meeting, date is not yet finalised. We proposed March 17 but a day here and there, mostly Modi will be there. Between March 17 and 20 it will happen. That will be a good way to kick off the campaign. Modi, Naidu, Pawan, all together," the sources added.

Another TDP source emphasised that if Modi participates in this meeting, it could be the first time in a decade that Modi, Naidu and Kalyan would be sharing stage.

Let the Truth be known. If you read VB and like VB, please be a VB Supporter and Help us deliver the Truth to one and all.



Mumbai (PTI): The Mumbai-bound carriageway of the Mumbai-Pune Expressway connecting link was opened to vehicular traffic on Saturday noon after a delay caused by the dismantling of inauguration infrastructure and cleaning work, a day after the Pune section became operational.

The 13.3 km-long "missing link", which bypasses a section of the Bhor Ghat stretch of the expressway and cuts travel time between Mumbai and Pune by 25 to 30 minutes, was inaugurated a day earlier by Chief Minister Devendra Fadnavis in the presence of Deputy CMs Eknath Shinde and Sunetra Pawar.

The Pune-bound carriageway of the corridor was opened to traffic immediately; however, the Mumbai-bound section remained closed to traffic for several hours after the inauguration.

An official of the Maharashtra State Road Development Corporation told PTI on Saturday that the opening of the Mumbai-bound carriageway was delayed mainly due to the dismantling of the inauguration infrastructure and cleaning work.

The removal of the stage and other decorations was completed in the morning. The work to load and transport the material slightly delayed the opening of the carriageway.

Vehicular movement on the carriageway began after all the remaining material was cleared and road cleaning was completed, the official added.

The expressway control room said that despite significant vehicular movement, the access-controlled highway has not witnessed any major traffic snarls since Friday evening, after the Pune-bound carriageway of the missing link was opened to traffic.

The Missing Link project connects Khopoli (in Raigad) on the Mumbai side to Kusgaon near Lonavala in Pune district and is expected to make the expressway fully access-controlled, easing congestion in the ghat section.

Developed by the MSRDC and dubbed an "engineering marvel", the project includes two tunnels, two viaducts and a cable-stayed bridge over Tiger Valley. It bypasses the steep, accident-prone ghat section, where frequent traffic snarls are reported during weekends and on public holidays.