Mumbai (PTI): Railway Minister Ashwini Vaishnaw on Saturday initiated the breakthrough of a five-kilometre-long tunnel in Thane near Mumbai, marking a significant achievement in the Mumbai-Ahmedabad bullet train project.
Standing at one of the openings of the tunnel, Vaishnaw pushed the button and triggered a controlled dynamite blast to break through its final layer, completing five km of excavation.
Briefing mediapersons present at the site to cover the event, Vaishnaw called it a "landmark achievement" and reiterated that the 50-km-long first section between Surat and Billimora will be completed by December 2027.
Vaishnaw appreciated the progress of the project, saying this tunnel is a part of the total 21-km-long tunnel, out of which seven km passes through the sea. This 21-km tunnel is being constructed by the Afcons Infrastructure Limited.
"The Afcons Infrastructure Limited navigated through significant challenges, including tough rocky strata of Deccan Trap, limited overburden, the presence of utilities, among others. Afcons, in collaboration with NHSRCL, successfully overcame these difficulties while strictly adhering to safety standards," the company's spokesperson said.
The 508-km-long project will run between Mumbai and Ahmedabad.
Officials said that the excavation was done through the 'drill and blast' method, and henceforth, a tunnel-boring machine will be used.
This 5 km tunnel runs between Ghansoli and Shilphata in Maharashtra.
Let the Truth be known. If you read VB and like VB, please be a VB Supporter and Help us deliver the Truth to one and all.
New Delhi (PTI): The West Central Railway Zone has constituted a high administrative grade-level inquiry committee to investigate the fire on the Thiruvananthapuram Central-Hazrat Nizamuddin Rajdhani Express on Sunday.
The fire erupted at 5.15 am in the B-1 passenger coach of the train between Vikramgarh Alot and Lunirichha stations under the Kota Railway division, one-and-a-half hours after it left the Ratlam Junction in Madhya Pradesh, according to an official. The fire also damaged the luggage brake and generator car behind the coach.
"The committee has been nominated by the general manager of West Central Railway (WCR). It comprises senior officers from the West Central Railway, Integral Coach Factory in Chennai, and RDSO (Research Designs and Standards Organisation)," the Railway Board said in a press note.
"Principal chief safety officer, WCR, has been appointed as the convener of the committee," it said, also mentioning other committee members such as principal chief electrical engineer, principal chief mechanical engineer, principal chief security officer from the WCR zone, and principal chief mechanical engineer from the Integrated Coach Factory, among others.
As per the provisions of the Accident Manual, the committee has been directed to complete the inquiry within the stipulated timeframe.
The Board stated that the committee will conduct a detailed examination of the causes of the incident, technical aspects and safety parameters so as to prevent recurrence of such incidents in future.
"Indian Railways remains committed to ensuring the safety and security of passengers and is taking all necessary measures in this regard," it added.
