Bengaluru, Mar 11: Karnataka Minister for Large and Medium Industries MB Patil on Monday chaired a board meeting of the state-owned Mysore Paints and Varnish Limited to discuss the strategies needed to be adopted to increase its production capacity and financial turnover and added that the aim is to develop "Mysore Paints" as a brand to enable it compete with private players.
Speaking after the meeting, the minister in a statement said, the enterprise which is one of the prestigious factories set up during the Mysuru Maharaja's regime is currently performing an annual turnover of around Rs 34-35 crore.
However, now, there is a requirement for indelible ink due to the upcoming Lok Sabha elections and the turnover this year is expected to touch Rs. 77 crore, he added.
ALSO READ: Water crisis: Legal action against drilling unauthorised borewells in Bengaluru: BWSSB
Emphasising that the enterprise will be upgraded to align with the competitive market, he informed that the factory will enter into manufacturing of home paints soon.
Further, Patil stated, that there is a thought to manufacture paints, emulsions etc required for government buildings including schools, colleges, and hostels in the factory.
Considering this, permission has been given to appoint an expert from the paint industry as the consultant. The aim is to develop "Mysore Paints' as a brand to enable compete with private players. The market will also be expanded rationally and paints will be made available at competitive prices, Patil explained.
Let the Truth be known. If you read VB and like VB, please be a VB Supporter and Help us deliver the Truth to one and all.
Mumbai (PTI): The Mumbai-bound carriageway of the Mumbai-Pune Expressway connecting link was opened to vehicular traffic on Saturday noon after a delay caused by the dismantling of inauguration infrastructure and cleaning work, a day after the Pune section became operational.
The 13.3 km-long "missing link", which bypasses a section of the Bhor Ghat stretch of the expressway and cuts travel time between Mumbai and Pune by 25 to 30 minutes, was inaugurated a day earlier by Chief Minister Devendra Fadnavis in the presence of Deputy CMs Eknath Shinde and Sunetra Pawar.
The Pune-bound carriageway of the corridor was opened to traffic immediately; however, the Mumbai-bound section remained closed to traffic for several hours after the inauguration.
An official of the Maharashtra State Road Development Corporation told PTI on Saturday that the opening of the Mumbai-bound carriageway was delayed mainly due to the dismantling of the inauguration infrastructure and cleaning work.
The removal of the stage and other decorations was completed in the morning. The work to load and transport the material slightly delayed the opening of the carriageway.
Vehicular movement on the carriageway began after all the remaining material was cleared and road cleaning was completed, the official added.
The expressway control room said that despite significant vehicular movement, the access-controlled highway has not witnessed any major traffic snarls since Friday evening, after the Pune-bound carriageway of the missing link was opened to traffic.
The Missing Link project connects Khopoli (in Raigad) on the Mumbai side to Kusgaon near Lonavala in Pune district and is expected to make the expressway fully access-controlled, easing congestion in the ghat section.
Developed by the MSRDC and dubbed an "engineering marvel", the project includes two tunnels, two viaducts and a cable-stayed bridge over Tiger Valley. It bypasses the steep, accident-prone ghat section, where frequent traffic snarls are reported during weekends and on public holidays.
