Paris, Aug 1: India's Lakshya Sen registered a comfortable straight-game win over compatriot HS Prannoy to become only the third male player ever from the country to reach the quarterfinals of the Olympics badminton competition here on Thursday.
The 22-year-old from Almora, a reigning Commonwealth Games champion and a 2021 World Championships bronze-medallist, looked in complete control as he notched up a 21-12 21-6 win over world no. 13 Prannoy in a 39-minute pre-quarterfinal clash.
Sen joined Parupalli Kashyap and Kidambi Srikanth, who had reached the quarterfinals in the London and Rio edition of the Olympic Games in 2012 and 2016 respectively.
Currently ranked 22, Sen will face 12th seed Chinese Taipei's Chou Tien Chen in the quarterfinals.
"I think having tough matches gives you confidence. I am now ready to go deep into the tournament. It will be a tricky match against Chou, I have to go and recover well and give my 100 %," Sen said after the match.
Sen was steady in his defense and mixed his attack well, while Prannoy, who played a three-game match last evening, looked tired and didn't show much resistance during the 39-minute contest.
It was the end of campaign for Prannoy, who had recovered from a bout of Chikungunya to compete at his maiden Olympics.
Sen was off to a good start, leading 7-4. He kept things under control as Prannoy seemed to struggle, played too defensively and was left to do the catch-up act. Sen closed out the opening game comfortably.
The second game was a blur as Sen looked rock solid and quickly wrapped up the contest after leading all the way.
Let the Truth be known. If you read VB and like VB, please be a VB Supporter and Help us deliver the Truth to one and all.
Gopeshwar/Dehradun (PTI): Chamoli District Magistrate Gaurav Kumar on Wednesday ordered a magisterial inquiry into the collision between two loco trains inside the Pipalkoti tunnel of the under-construction Vishnugad-Pipalkoti hydropower project, which left 88 people injured.
Earlier in the day, Kumar said that the accident occurred around 8.30 pm on Tuesday at the TBM (Tunnel Boring Machine) site inside the tunnel being built by THDC (India).
A loco train carrying workers for tunnel excavation during the night shift was about two kilometres inside the tunnel when another loco train coming from the opposite direction lost control and collided with it.
One of the trains had workers and officials on board, while the other carried material.
Upon receiving information about the collision, Uttarakhand Chief Minister Pushkar Singh Dhami ordered proper treatment for the injured. He spoke to the DM over the phone and instructed him to ensure that all the injured receive the best possible medical facilities.
DM Kumar and Superintendent of Police Surjit Singh Panwar met the injured at the Gopeshwar District Hospital.
Kumar said 109 people were on board the loco train at the time of the accident, most of them labourers. None of the injured was serious, he said.
He said that 88 of them were injured, although none of them are in serious condition. They said that 84 workers were discharged after receiving first aid, while four are still hospitalized.
DM Kumar and SP Panwar also inspected the project site and sought detailed information about the incident from the project officials.
They instructed them to strictly implement all necessary safety standards to prevent a recurrence of such an incident in the future.
After inspection, the DM issued orders for a magisterial inquiry into the accident caused by the collision of the loco trains.
Meanwhile, the Railways said the trains involved in the collision had no connection with it.
"It is clarified that this unfortunate incident occurred in Uttarakhand's Chamoli district, involving a trolley used in the local transportation system during the construction of a hydroelectric project tunnel. The train referred to in the news reports is not an Indian Railways train, but a transportation system being used locally by the project team," the government entity said in a statement.
According to officials, rail-like vehicles are used to transport workers, employees, and materials for construction work inside the tunnel.
The project, being built between Helang and Pipalkoti on the Alaknanda River, will generate 444 megawatts of electricity through four turbines. The project is targeted for completion by next year.
