Beijing, Oct 23 : China on Tuesday officially opened the 55-km-long sea bridge, said to be the world's longest, connecting Hong Kong to Macau and the mainland Chinese city of Zhuhai.
President Xi Jinping inaugurated the USD 20 billion bridge at a special ceremony held in Zhuhai, in southern China's Guangdong Province, attended by about 700 guests, including the leaders of Hong Kong and Macau.
It was opened with a one sentence speech by Xi, the Hong Kong-based South China Morning Post reported. The construction of the bridge started in December 2009 and was to be completed in 2016.
Situated in the Lingdingyang waters of the Pearl River estuary, it will be the world's longest sea bridge, the state-run Xinhua news agency said.
China claims credit for building the world's longest bridge, the 164.8-km-long Danyang Kunshan Grand viaduct on the Beijing- Shanghai high speed railway.
The bridge, which will be opened for regular traffic from Wednesday, will slash the travel time between Hong Kong and Zhuhai from three hours to just 30 minutes, it said, adding it will further integrate the cities in the Pearl River Delta.
Chinese Vice-Premier Han Zheng said the bridge would bring Hong Kong and mainland China closer in terms of economic and trade activities.
Describing the bridge as a sign of successful cooperation between the Chinese mainland, Hong Kong and Macau he said, it is a demonstration of China's engineering capabilities.
Han, Beijing's man in-charge of regional economic integration, said that the 55-km-long bridge could facilitate the development of "one country, two systems", a framework that allows Hong Kong and Macau a certain degree of autonomy.
He said it was the first time the three sides had worked together on a major infrastructure project.
"It opens up all three places for greater exchange in trade and economics. It also enhances the competitiveness of the Pearl River Delta," the Post quoted him as saying.
The bridge would help Hong Kong and Macau be integrated to mainland China, he added.
Hong Kong Chief Executive Carrie Lam Cheng Yuet-ngor highlighted the three cross-border infrastructure projects the Guangzhou-Shenzhen-Hong Kong express rail link, the Hong Kong-Zhuhai-Macau bridge and the Liantang/Heung Yuen Wai boundary control point which will open early next year.
But, the critics have called the bridge a "white elephant" and a "blood and sweat project", noting 10 workers have died and more than 600 were injured during its construction, the Post reported.
Additional concerns surfaced earlier this year when officials revealed that estimates for the amount of traffic expected for the bridge had been cut.
A 2008 consultancy study had predicted that 33,100 vehicles and 1,71,800 passengers would cross the bridge daily by 2030.
But the estimate was lowered to 29,100 vehicles and 1,26,000 passenger trips in a 2016 study, down 12 per cent and 26 per cent respectively, the report said.
Let the Truth be known. If you read VB and like VB, please be a VB Supporter and Help us deliver the Truth to one and all.
New Delhi, Nov 26: Former media executive Indrani Mukerjea, accused of killing her daughter Sheena Bora, has moved the Supreme Court challenging the Bombay High Court ruling denying her to travel abroad.
A special court on July 19 allowed Mukerjea's plea to travel to Spain and the UK for 10 days between intermittent periods over the next three months.
The CBI approached the high court challenging the order passed by the special court but the high court quashed the special court order on September 27.
Mukerjea has now moved the apex court challenging the high court's verdict.
In her plea filed in the top court through advocate Sana Raees Khan, Mukerjea said she was a British citizen, and sought permission to visit Spain and her home country for "making necessary changes and amendments and taking care of pending work which cannot be transacted without her personal presence".
She argued the activation of a digital certificate was a must for all relevant work and administration in Spain and her physical presence was mandatory.
In its verdict, the high court noted Mukerjea wanted to travel abroad on the ground that she was a British national and was required to execute documents regarding her bank account and perform other work in Spain and the UK.
While setting aside the special court's order, the high court said if Mukerjea wished to perform these works from India, the statutory authorities back home would extend her the necessary support with the assistance of Embassy of Spain and the UK.
Mukerjea was arrested in August 2015 after the murder of Bora came to light. In May 2022, she was granted bail by the Supreme Court.
She has denied the allegations.
Bora (24) was allegedly strangled to death in a car by Mukerjea, her then-driver Shyamvar Rai and former husband Sanjeev Khanna in April 2012 in Mumbai. Her body was then burnt in a forest in the neighbouring Raigad district, according to the prosecution.
Bora was Mukerjea's daughter from her previous relationship.
The killing came to light in 2015 when Rai reportedly revealed about it during interrogation by police after his arrest in a separate case registered under the Arms Act.
Mukerjea's ex-husband Peter Mukerjea was also arrested for allegedly being a part of the conspiracy linked to the murder, probed by the CBI.
All the accused are currently out on bail.