Hyderabad, (PTI): Alleging that the Central government kept the country in the dark over the incident of Indian and Chinese troops clashing along the Line of Actual Control, AIMIM president Asaduddin Owaisi on Monday said he will be giving an adjournment motion on the issue in Parliament on December 13.

In a series of tweets, the Hyderabad MP further accused that the "weak political leadership" under Prime Minister Narendra Modi has led to "this humiliation against China".

"The reports coming from Arunachal Pradesh are worrying and alarming. A major clash took place between Indian and Chinese soldiers and the government has kept the country in the dark for days. Why was the Parliament not informed, when it is in session?" Owaisi tweeted.

In another tweet, Owaisi said: "The army is capable of giving a fitting reply to the Chinese at any time. It is the weak political leadership under Modi which has led to this humiliation against China. This needs an urgent discussion in Parliament. I will be giving an Adjournment motion tomorrow on this issue."

Owaisi said the details of the incident are sketchy and in another tweet sought to know: "What was the cause of the clash? Were shots fired or was it like Galwan? How many soldiers have been injured? What is their condition? Why can't the Parliament extend their public support to the soldiers to send a strong message to China?"

Indian and Chinese soldiers clashed at a location along the Line of Actual Control (LAC) in the Tawang sector of Arunachal Pradesh on December 9, resulting in minor injuries to a few personnel from both sides, military sources said on Monday.

The Indian troops resolutely confronted the Chinese PLA soldiers, the sources said.

Let the Truth be known. If you read VB and like VB, please be a VB Supporter and Help us deliver the Truth to one and all.



Mumbai (PTI): The Mumbai-bound carriageway of the Mumbai-Pune Expressway connecting link was opened to vehicular traffic on Saturday noon after a delay caused by the dismantling of inauguration infrastructure and cleaning work, a day after the Pune section became operational.

The 13.3 km-long "missing link", which bypasses a section of the Bhor Ghat stretch of the expressway and cuts travel time between Mumbai and Pune by 25 to 30 minutes, was inaugurated a day earlier by Chief Minister Devendra Fadnavis in the presence of Deputy CMs Eknath Shinde and Sunetra Pawar.

The Pune-bound carriageway of the corridor was opened to traffic immediately; however, the Mumbai-bound section remained closed to traffic for several hours after the inauguration.

An official of the Maharashtra State Road Development Corporation told PTI on Saturday that the opening of the Mumbai-bound carriageway was delayed mainly due to the dismantling of the inauguration infrastructure and cleaning work.

The removal of the stage and other decorations was completed in the morning. The work to load and transport the material slightly delayed the opening of the carriageway.

Vehicular movement on the carriageway began after all the remaining material was cleared and road cleaning was completed, the official added.

The expressway control room said that despite significant vehicular movement, the access-controlled highway has not witnessed any major traffic snarls since Friday evening, after the Pune-bound carriageway of the missing link was opened to traffic.

The Missing Link project connects Khopoli (in Raigad) on the Mumbai side to Kusgaon near Lonavala in Pune district and is expected to make the expressway fully access-controlled, easing congestion in the ghat section.

Developed by the MSRDC and dubbed an "engineering marvel", the project includes two tunnels, two viaducts and a cable-stayed bridge over Tiger Valley. It bypasses the steep, accident-prone ghat section, where frequent traffic snarls are reported during weekends and on public holidays.