Balangir (Odisha), Dec 17: A Class 9 student suffered critical injuries after a javelin pierced his neck during the annual sports meet of a government school in Odisha's Balangir district on Saturday, officials said.
The student, identified as Sadananda Meher, is now out of danger.
The javelin, thrown by another student at Agalpur Boys' Panchayat High School during a practice session, struck Meher from the right side of his neck and a portion of its head came out from his left side.
The boy, along with the javelin stuck below his chin, was rushed to the Bhima Bhoi Medical College and Hospital in Balangir, where it was safely brought out by doctors. However, Meher is now admitted to the ICU of the hospital.
"There was a sports meet in the school and this unfortunate incident happened. We are relieved that the child is out of danger," Balangir Collector Chanchal Rana told PTI.
The district collector has ordered officials to provide immediate assistance of Rs 30,000 to the family of the student.
Chief Minister Naveen Patnaik has also directed that the boy be provided with better treatment and the funds needed for it will be met from the Chief Minister's Relief Fund.
Speaking about the accident, the child's uncle, Achyutananda Meher said, "I rushed to the hospital after the school authorities informed me about it."
The sports meet was suspended following the accident.
Let the Truth be known. If you read VB and like VB, please be a VB Supporter and Help us deliver the Truth to one and all.
Gopeshwar/Dehradun (PTI): Chamoli District Magistrate Gaurav Kumar on Wednesday ordered a magisterial inquiry into the collision between two loco trains inside the Pipalkoti tunnel of the under-construction Vishnugad-Pipalkoti hydropower project, which left 88 people injured.
Earlier in the day, Kumar said that the accident occurred around 8.30 pm on Tuesday at the TBM (Tunnel Boring Machine) site inside the tunnel being built by THDC (India).
A loco train carrying workers for tunnel excavation during the night shift was about two kilometres inside the tunnel when another loco train coming from the opposite direction lost control and collided with it.
One of the trains had workers and officials on board, while the other carried material.
Upon receiving information about the collision, Uttarakhand Chief Minister Pushkar Singh Dhami ordered proper treatment for the injured. He spoke to the DM over the phone and instructed him to ensure that all the injured receive the best possible medical facilities.
DM Kumar and Superintendent of Police Surjit Singh Panwar met the injured at the Gopeshwar District Hospital.
Kumar said 109 people were on board the loco train at the time of the accident, most of them labourers. None of the injured was serious, he said.
He said that 88 of them were injured, although none of them are in serious condition. They said that 84 workers were discharged after receiving first aid, while four are still hospitalized.
DM Kumar and SP Panwar also inspected the project site and sought detailed information about the incident from the project officials.
They instructed them to strictly implement all necessary safety standards to prevent a recurrence of such an incident in the future.
After inspection, the DM issued orders for a magisterial inquiry into the accident caused by the collision of the loco trains.
Meanwhile, the Railways said the trains involved in the collision had no connection with it.
"It is clarified that this unfortunate incident occurred in Uttarakhand's Chamoli district, involving a trolley used in the local transportation system during the construction of a hydroelectric project tunnel. The train referred to in the news reports is not an Indian Railways train, but a transportation system being used locally by the project team," the government entity said in a statement.
According to officials, rail-like vehicles are used to transport workers, employees, and materials for construction work inside the tunnel.
The project, being built between Helang and Pipalkoti on the Alaknanda River, will generate 444 megawatts of electricity through four turbines. The project is targeted for completion by next year.
