Damoh (MP), (PTI): Congress leader and former Madhya Pradesh minister Raja Pateria was arrested on Tuesday morning for his controversial `be ready to kill Modi to save the Constitution' remark about the prime minister.
He was arrested by the police from his residence in Hata town of the state's Damoh district, an official said.
"A police team went to his house around 5.30 am to inform him about the arrest. They took him to Pawai (in Panna district) around 7 am," Hata sub divisional officer of police Virendra Bahadur Singh told PTI.
In a video that surfaced on social media on Monday morning, Pateria could be heard telling Congress workers at a meeting in Pawai, "Be ready to kill Modi. Kill in the sense of defeating him.....Modi will end the elections. Modi will divide on the basis of religion, caste and language. The future of Dalits, tribals and minorities is in danger. If you want to save the Constitution, then be ready to kill Modi. Kill in the sense of defeating him."
Subsequently, a First Information Report was registered against him.
Let the Truth be known. If you read VB and like VB, please be a VB Supporter and Help us deliver the Truth to one and all.
Mumbai (PTI): The Mumbai-bound carriageway of the Mumbai-Pune Expressway connecting link was opened to vehicular traffic on Saturday noon after a delay caused by the dismantling of inauguration infrastructure and cleaning work, a day after the Pune section became operational.
The 13.3 km-long "missing link", which bypasses a section of the Bhor Ghat stretch of the expressway and cuts travel time between Mumbai and Pune by 25 to 30 minutes, was inaugurated a day earlier by Chief Minister Devendra Fadnavis in the presence of Deputy CMs Eknath Shinde and Sunetra Pawar.
The Pune-bound carriageway of the corridor was opened to traffic immediately; however, the Mumbai-bound section remained closed to traffic for several hours after the inauguration.
An official of the Maharashtra State Road Development Corporation told PTI on Saturday that the opening of the Mumbai-bound carriageway was delayed mainly due to the dismantling of the inauguration infrastructure and cleaning work.
The removal of the stage and other decorations was completed in the morning. The work to load and transport the material slightly delayed the opening of the carriageway.
Vehicular movement on the carriageway began after all the remaining material was cleared and road cleaning was completed, the official added.
The expressway control room said that despite significant vehicular movement, the access-controlled highway has not witnessed any major traffic snarls since Friday evening, after the Pune-bound carriageway of the missing link was opened to traffic.
The Missing Link project connects Khopoli (in Raigad) on the Mumbai side to Kusgaon near Lonavala in Pune district and is expected to make the expressway fully access-controlled, easing congestion in the ghat section.
Developed by the MSRDC and dubbed an "engineering marvel", the project includes two tunnels, two viaducts and a cable-stayed bridge over Tiger Valley. It bypasses the steep, accident-prone ghat section, where frequent traffic snarls are reported during weekends and on public holidays.
