Srinagar, Jan 25 (PTI): Years of hard work and dedication, and some engineering marvels later, the dream of Kashmir to be connected by rail finally came to fruition after a specially-designed Vande Bharat Express train arrived in the city on Saturday, completing its trial run.

The train, on its maiden trial run, arrived at Srinagar station in the Nowgam area on the city's outskirts from Katra in Jammu.

It reached Jammu on Friday.

Slogans and praises for the Indian Railways greeted the orange-and-grey-coloured Vande Bharat train as it reached the station at 11:30 am.

A large number of people and rail officials waited since morning, many of them carrying garlands, to welcome those aboard the train.

After a brief half at the station, the train moved to Budgam station to complete its trial run.

Northern Railway's Chief Area Manager (Srinagar) Saqib Yousuf said the trial run's completion marked a historic moment.

"This is a historic step. It reflects the vision of our prime minister to connect Kashmir with the rest of the country," he said.

Yousuf said the trial was also to ascertain the time the train would take on various sections.

The successful completion of the trial run is a result of the fast-paced hard work over the past 10 years that was put in to complete the line, he added.

Prime Minister Narendra Modi is expected to flag off the train from Katra, as the commissioner of railway safety has given the green signal for running the service on the Katra-Baramulla section.

The date for the flag-off ceremony is yet to be announced.

The Railways completed 272 kilometres of the Udhampur-Srinagar-Baramulla Rail Link (USBRL) project last month.

According to rail officials, the Railway Board, on June 8 last year, unveiled a Vande Bharat Express train specially designed to operate in Jammu and Kashmir's challenging winter conditions for the Katra-Srinagar route. The train incorporates special climate-related features.

Compared to the other 136 Vande Bharat trains running in different parts of the country, this train has several additional features to meet operational challenges and passengers' needs in Jammu and Kashmir's extreme weather conditions.

It includes advanced heating systems that prevent the freezing of water in pipes and bio-toilet tanks, provide warm air for the vacuum system and ensure optimal functioning of the air-brake system for smooth operations, even in sub-zero temperatures.

The train also features embedded heating elements in the windshield to automatically defrost the driver's front lookout glass, ensuring clear visibility in harsh winter conditions.

Additionally, it features all other amenities of the existing Vande Bharat trains -- fully air-conditioned coaches, automatic plug doors and mobile charging sockets, among others.

"The train has been provided to run especially through the mountainous terrain of Jammu and Kashmir and made to withstand sub-zero temperatures and snowy conditions," Yousuf said.

"It has heating units to withstand sub-zero temperatures, heating pads to avoid the freezing of water in pipes and tanks, and an ambient temperature control system in the driver's cab. All these facilities have been designed to deal with the snowy and cold conditions," he added.

The commissioner of railway safety's approval marked a significant step towards completing the USBRL project, which aims at connecting the Kashmir valley to the broader Indian Railways network.

Over the past month, the Indian Railways conducted six trial runs on various sections of the track, including crucial milestones such as the country's first cable-stayed rail bridge -- the Anji Khad bridge -- and the arch bridge over the Chenab river in Kauri.

The Anji Khad bridge -- a critical part of the USBRL project -- is an engineering marvel, featuring a single pylon rising 331 metres above the river bed. The pylon, which took several years to complete, now rises 191 metres above its foundation level.

With a total length of 473.25 metres, the Anji Khad bridge is one of the two highest railway bridges in the world, alongside the Chenab bridge -- which holds the title of the world's highest railway bridge at 359 metres above the river bed, 35 metres taller than the Eiffel Tower in Paris.

Sharma Rama Rao, a tourist from Hyderabad, said starting Vande Bharat services to Kashmir was a very good step.

"It should have happened much earlier. It will increase tourist footfall and also lead to higher business," Rao said.

People face some difficulties while travelling via road, and the road remains closed sometimes, he said. "That problem will now be over with the train."

Another tourist from Hyderabad, Chakrapani, said it would be easy and comfortable to travel from Delhi to Srinagar.

"It is a very good move. It is easy to commute now from Delhi to Srinagar. The economy will be developed by this train. The journey will be entirely different. Vande Bharat is a luxury train, people want to travel comfortably and rail transportation is a very good option," he added.

A tourist from Kerala said the train would be very helpful for the tourists and the locals.

"It is a very good initiative," she said.

Mudasir Ahmad, a local, said the train would not only provide all-weather and comfortable travel but also give an impetus to tourism and economy in Kashmir.

Jammu and Kashmir Lieutenant Governor Manoj Sinha described it as a historic moment and a dream come true.

"A historic moment and a dream come true! Trial run of Vande Bharat Express train from Shri Mata Vaishno Devi Railway Station, Katra, to Budgam has been successfully completed. Congratulations to Indian Railways officials and the team working on the ground," he said in a post on X.

Let the Truth be known. If you read VB and like VB, please be a VB Supporter and Help us deliver the Truth to one and all.



New Delhi (PTI): The Supreme Court on Friday expressed disappointment over the non-production of witnesses in the ongoing trial against Ashish Mishra, son of former Union minister Ajay Mishra, and others in the 2021 Lakhimpur Kheri violence case.

A bench of Chief Justice Surya Kant and Justice Joymalya Bagchi said the status report filed before it by the Uttar Pradesh government has not assigned any reason whatsoever for the non-production of witnesses.

It noted that no witnesses have been examined in the trial for the last two months.

"We direct the presiding judge to take lawful measures to secure the presence of witnesses," the bench said.

It asked the trial judge to make an endeavour to conclude the trial in a time-bound manner, and also to file a status report before it.

The trials in two cases related to the incident are going on before a court in Uttar Pradesh.

The bench noted that in the first case, out of 131 witnesses to be examined, 44 have been examined, 15 have been discharged and 72 are still to be produced.

In the second FIR, out of 35 witnesses, 26 have been examined and nine were left, it said.

Senior advocate Siddharth Dave, appearing for Ashish Mishra, said that as per the latest status report filed by Uttar Pradesh, 44 witnesses have been examined so far in the first FIR.

"No witnesses have been examined in the last two months," Dave said.

He argued that the last status report filed by the state in March also said that 44 witnesses had been examined.

"What have you done from March till today?" the bench asked the counsel appearing for Uttar Pradesh.

The state's counsel said that 3-4 witnesses were summoned for the recording of their deposition during the trial.

The bench said at least 7-8 witnesses should be summoned instead of three or four for a day, so that even if some of them do not turn up, the trial court could proceed with the recording of statements of those appearing before it.

The top court also wondered how official witnesses can remain absent during the trial.

"We are disappointed to note that the so-called status report does not assign any reason whatsoever for non-production of witnesses...," the bench said.

Advocate Prashant Bhushan, appearing for the relatives of the farmers who were allegedly mowed down in the incident, said the apex court will have to do something regarding the manner in which the trial was going on.

The bench noted that besides the two FIRs, another FIR was registered in October last year concerning alleged witness intimidation.

It said that, as per the state's status report, the chargesheet was filed against the main accused in that case.

The bench noted that the status report reveals that, as far as Ashish Mishra is concerned, his alleged role in the third case is still being investigated.

The top court directed the investigating officer of the third case to conclude the pending probe and ensure that the appropriate report is filed before the concerned court within four weeks.

The bench posted the next hearing in the Lakhimpur Kheri violence case for July.

On October 3, 2021, eight people, including four farmers, were killed in Tikunia in Lakhimpur Kheri district during a protest by farmers against Deputy Chief Minister Keshav Prasad Maurya's visit to the area.

Four farmers were mowed down by a sports utility vehicle. A driver and two BJP workers were then allegedly lynched by angry farmers. A journalist also died in the violence.

In one of the cases, the trial court in December 2023 framed charges against Mishra and 12 others for alleged murder, criminal conspiracy and under other penal laws in the case of the farmers' deaths, paving the way for the trial.