Bengaluru, Jun 19: Kannada actor Darshan Thoogudeepa, who has been arrested in the Renukaswamy murder case, has confessed to have given Rs 30 lakh to another accused Pradosh for the disposal of the body and to ensure that "his name does not come out anywhere," police have claimed.

The amount has been recovered from Pradosh's residence, police sources said.

"Darshan, who is accused number 2 (A2) in the case, has in his voluntary statement to police said that he had given Rs 30 lakh to Pradosh (A14) to dispose of the body, and

for the expenditure that would cost...for persons to carry out this task, and to ensure that his name doesn't come out anywhere," a police official said.

A total 17 people, including Darshan and his friend Pavithra Gowda, are accused in the murder case.

ALSO READ: Renukaswamy murder case: No pressure on me to shield actor Darshan, says CM Siddaramaiah

According to police sources, Renukaswamy, a fan of the actor, had sent obscene messages to Gowda, which enraged Darshan, allegedly leading to his murder. His body was found near a storm-water drain next to an apartment in Sumanahalli here on June 9.

"From the spot of the crime, things such as lathi and wooden logs used for the alleged assault have been recovered along with water bottle, blood stains and material evidence, and DVR containing the CCTV footage," the official said, adding, "blood stains were also found on the vehicle allegedly used for disposing of the body."

According to the autopsy report, Renukaswamy's death was caused due to shock and haemorrhage as a result of multiple blunt injuries he sustained. "Viscera samples have been sent to the Forensic Science Laboratory for further analysis," he said.

According to sources, one of the accused, Raghavendra, who is part of Darshan’s fan club in Chitradurga, had brought Renukaswamy to a shed in R R Nagar here, on the pretext that Darshan wanted to meet him. It was in this shed that he was allegedly tortured and killed.

The investigation team is believed to have gathered enough evidence, including CCTV footage, which could establish that Darshan was present during the alleged assault on Renukaswamy, leading to his death, sources said.

Get all the latest, breaking news from Karnataka in a single click. CLICK HERE to get all the latest news from Karnataka.

Let the Truth be known. If you read VB and like VB, please be a VB Supporter and Help us deliver the Truth to one and all.



Mumbai (PTI): Commercial operations on the first phases of Mumbai Metro corridors 9 and 2B began on Wednesday morning, a day after Maharashtra Chief Minister Devendra Fadnavis inaugurated the mass-transit routes, officials said.

While the Metro 9 marks the first direct connectivity between a suburb in Mumbai and a part of Thane city in the metropolitan region, the Line 2B will provide the first metro connectivity on the Harbour Line in Mumbai.

The 5.6-km elevated Phase 1 stretch of Metro Line 9 comprises four stations -- Dahisar East, Pandurangwadi, Miragaon and Kashigaon. The 5.53-km Phase 1 of Metro Line 2B has five stations, including Deshbhakt N G Acharya Udyan (Diamond Garden), Chhatrapati Shivaji Maharaj Chowk, Deonar, Mankhurd and Maharashtra Nagar–Mandale.

ALSO READ:  Speaker Om Birla to inaugurate CPA India Region meet in Panaji on Thursday

According to the Mumbai Metropolitan Region Development Authority (MMRDA), Line 9 is expected to cut travel time between Mira-Bhayandar in Thane district and Mumbai to around 30 minutes from the current one to two hours. Built at Rs 6,607 crore, it will eventually provide seamless connectivity to south Mumbai through interlinking with other lines.

With the addition of the two new lines, Mumbai’s operational Metro network has expanded to six corridors, including Line 1 (Ghatkopar-Andheri-Versova), Line 2A (Andheri West-Dahisar East), Line 7 (Dahisar East-Andheri East) and the underground Line 3 (Colaba-Bandra Kurla Complex-SEEPZ).

As per MMRDA, the revised timetable for Line 2A and Line 7 came into effect on Wednesday, aimed at improving frequency, predictability and overall commuter experience.

It said that with the inauguration of Line 9, Metro Line 2A will now operate as a standalone corridor between Andheri West and Dahisar East, with services from 5.50 am till around 11 pm and a peak frequency of about six minutes.

The integrated Line 7-9 corridor (Gundavali to Kashigaon), spanning 19.79 km, will operate from 5.50 am to 11 pm, with a peak frequency of under six minutes and 276 services on weekdays.

Metro Line 2B (Phase 1) services commenced at 6 am and will run till around 10.30 pm at intervals of approximately nine-and-a-half minutes, operating 209 services daily, according to officials.

MMRDA said the integration of Line 7 with Line 9 enables direct connectivity from Andheri East to Mira-Bhayandar, while Lines 2A and 7 will function as separate corridors.

A seamless interchange facility at Dahisar station will allow passengers to switch between Lines 2A and 7 without exiting the “paid” (ticketed) area.