Toronto (AP): Novak Djokovic withdrew from the National Bank Open, opting for additional rest after his loss to Carlos Alcaraz in the Wimbledon final.
Tennis Canada announced on Sunday that Djokovic pulled out of the only Canadian stop on the ATP Tour schedule due to fatigue. The 36-year-old, 23-time Grand Slam champion was set to begin his hard-court preparations for the U.S. Open after falling to the top-ranked Alcaraz last Sunday in a five-set final at Wimbledon.
"I have always enjoyed my time in Canada but after speaking with my team, we believe this is the right decision to take," said Djokovic, who has won the National Bank Open four times.
"I would like to thank Karl Hale, the tournament director, for understanding this decision. I really hope I can return to Canada and Toronto in the coming years to play in front of great fans there."
American Christopher Eubanks will gain automatic entry into the main draw as Djokovic's replacement. Eubanks is fresh off a surprising quarterfinal run at Wimbledon, where he beat No. 5 seed Stefanos Tsitsipas and No. 12 seed Cam Norrie en route to the final eight.
"Of course, we're disappointed that Novak won't be playing at the National Bank Open this year," Hale said. "He's an incredible player and one we know our fans were eager to watch at Sobeys Stadium.
"He will be missed but we still have a long list of sensational players confirmed for this year's event, including 41 of the top 42 players in the world."
Toronto's Sobeys Stadium will host the men's side of the national tennis championship from Aug. 3 to Aug. 13. The women's side will be at Montreal's IGA Stadium at the same time.
Let the Truth be known. If you read VB and like VB, please be a VB Supporter and Help us deliver the Truth to one and all.
New Delhi (PTI): Noida International Airport on Friday announced the appointment of its Chief Financial Officer Nitu Samra as the interim Chief Executive Officer after authorities denied permission for foreign national Christoph Schnellmann to be at the helm.
"This change follows directions issued by the Bureau of Civil Aviation Security (BCAS) that the Chief Executive Officer of an airport in India is required to be an Indian national," NIA said in a statement.
Samra will replace Schnellmann, a Swiss national who has led Noida International Airport (NIA) as the CEO since August 2020.
The regulatory issue related to the requirement of having an Indian national as CEO has been delaying the start of commercial operations of the airport, which was inaugurated by Prime Minister Narendra Modi on March 28.
Schnellmann will join the airport's Board of Directors as Executive Vice Chairman. In this role, he will continue to support the project and its transition to operations, the statement said.
With immediate effect, NIA said Samra has been appointed as the CEO on an interim basis until the Board of Directors can conclude a formal selection process.
Samra has been serving as the CFO since October 2021 and was closely involved in the airport’s development journey, overseeing financial stewardship, governance, and strategic planning during a key phase of the project, the statement added.
NIA will be operated by Yamuna International Airport Pvt Ltd (YIAPL), a subsidiary of Zurich Airport International AG, under a public-private partnership.
Originally scheduled to commence passenger services in September 2024, NIA is being developed in four phases, along with a dedicated cargo terminal. It received an aerodrome license from the aviation regulator Directorate General of Civil Aviation (DGCA) in March.
YIAPL Chairman Daniel Bircher said that since the inauguration of the airport by the Prime Minister, the goal was to enable the start of operations as early as possible.
"This management change brings the airport into compliance with Bureau of Civil Aviation Security requirements while maintaining continuity in the airport’s leadership team. The newly structured team will support a smooth transition into operations, guided by clear and transparent governance and a strong corporate culture," he said.
On March 28, Civil Aviation Minister K Rammohan Naidu said commercial flight operations from the airport would start in the next 45 to 60 days.
Among the largest greenfield airport projects in the country, NIA will initially have a capacity to handle 12 million passengers per annum.
Once fully developed, the airport will have a total passenger handling capacity of 70 million.
The first phase of NIA has been developed at an investment of around Rs 11,200 crore. 'DXN' is the code for the airport.
The airport features a 3,900-metre runway capable of handling wide-body aircraft, along with modern navigation systems, including Instrument Landing System (ILS) and advanced airfield lighting.
The peak handling capacity in the first phase will be 30 flights per hour.
In the first phase, there will be 28 aircraft stands, and the projected cargo capacity is around 2.5 lakh tonnes.
Terminal 1 of the airport is spread across 1,37,985 square metres with 48 check-in counters. Over 40 acres of land have been earmarked for developing MRO (Maintenance, Repair and Overhaul) facilities at the airport.
