Chennai, July 5: Having lost the Test and ODI series, South Africa bounced back to defeat India by 12 runs in the first women's T20I to secure their first win of the multi-format tour, here on Friday.

Opener Tazmin Brits (81; 56b) and Marizanne Kapp (57; 33b) struck belligerent fifties as South Africa posted an imposing 189/4 after India opted to bowl.

In reply, Smriti Mandhana (46; 30b) and Shafali Verma (18; 14b) gave India a brisk start before South Africa triggered the collapse.

Jemimah Rodrigues raised India's hopes lower down the order with 53 not out from 30 balls, while Harmanpreet Kaur made 35. But South Africa held nerves to restrict them to 177/4.

Earlier, Brits slammed three sixes and 10 fours in her career-best knock of 81. Kapp hit eight fours and one as the duo stitched 96-run partnership from 56 balls.

Skipper Laura Wolvaardt made 33 from 22 balls and Brits raced to 50 runs in 43 balls for the opening wicket before Radha Yadav (2/40) gave India the first breakthrough.

Pooja Vastrakar was the pick of Indian bowling with her 2 for 23.

The second and third T20Is are slated here on Sunday and Tuesday.

India had defeated South Africa in the one-off Test before sweeping the ODI series 3-0.

Brief Scores:

South Africa 189/4 in 20 overs (Tazmin Brits 81, Marizanne Kapp 57; Pooja Vastrakar 2/23, Radha Yadav 2/40).

India 177/4 in 20 overs (Jemimah Rodrigues 53, Smriti Mandhana 47).

Let the Truth be known. If you read VB and like VB, please be a VB Supporter and Help us deliver the Truth to one and all.



Bengaluru: Namma Metro is reportedly planning to develop an expansive parking facility and commercial space near the KR Puram station as part of an integrated property development initiative to increase non-fare revenue.

The greenfield project will feature an 11-storey building, plus ground floor and two basements. This facility will be located merely 50 metres from the forthcoming interchange metro station connecting the Purple and Blue lines, according to a report by Deccan Herald published on Monday.

Raghavendra Rao, Deputy Chief Engineer (Property Development Division), Bangalore Metro Rail Corporation Limited confirmed that the project would be developed under a public-private partnership (PPP) model, with a tenure of 30 years. He told DH that the parking facility would occupy the two basement levels, while the upper floors would be designated for commercial use, offering opportunities for office spaces, retail outlets, and shopping malls.

The BMRCL anticipates substantial revenue from this venture, including an upfront non-refundable premium of Rs 10 crore, along with a minimum of Rs 2 crore in annual licence fees, Rao added.

Requests for proposals for the project have already been invited, with the final date for bid submissions set for May 13, 2025. The report mentioned that the the successful bidder will design, finance, build, operate and transfer the project, which will be valid for 30 years, including two years of construction.

The project is expected to be ready by 2027.